Contact Information:
Owner: PacfiCorp Energy (503) 769-4525
Genral Contractor: Slayden Construction - Steve Flett (503) 769-1969
|
As a subcontractor to Slayden Construction Group we were hired to complete the site work for the Merwin Dam Upstream Fish Passage Project. Our scope of work includes Site Grading, Rock Excavation, On-site Crushing and material processing, Utility and yard piping installations, building excavation and prep work. Once this is complete this will the provide the fish an easier route to make their way upstream of the dam.
|
|